Grid GuardianOpen the evidence in the app

Westgate Power

Westgate Power, Westgate Power, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.33 MW, grid supply point Northfleet East.

Customer
Westgate Power
Status
Connected
Capacity
5.33 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Northfleet East
Bulk supply point
Northfleet East 33kV
Point of connection
Gravesend West 11kV
Voltage
11 kV
Date connected
24 May 2022
In a connection queue
No
Row last updated by the DNO
15 Jan 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Unit F6A Northfleet Industrial Estate, Northfleet
Postcode
DA11 9SW
Export MPAN
1900092181169
Import MPAN
1900092181958

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source