West Of A134 Bury Road

West Of A134 Bury Road, Low Carbon Farming, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.4 MW, grid supply point Bramford.

Customer
Low Carbon Farming
Status
Connected
Capacity
2.4 MW
Maximum import capacity
8.9 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
Yes (capacity not firm)
Grid supply point
Bramford
Bulk supply point
Thetford Grid 33kV
Voltage
33 kV
Date connected
19 Oct 2021
In a connection queue
No
Row last updated by the DNO
16 Jun 2022
Licence area
EPN
Address
Bury St. Edmunds
Postcode
IP31 1HT
Export MPAN
1050002018468
Import MPAN
1050001523760

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.