Grid GuardianOpen the evidence in the app

Ware Solar Farm

Ware Solar Farm, The Farm Energy Company, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Rye House.

Customer
The Farm Energy Company
Status
Accepted to connect
Capacity
10 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Rye House
Bulk supply point
Rye House Grid 33kV
Point of connection
Glaxo Primary 11kV
Voltage
33 kV
Date accepted
10 Mar 2022
Target energisation
31 Oct 2034
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2026
Licence area
EPN
Address
Park Road, Ware
Postcode
SG12 0DP

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source