Ware Solar Farm
Ware Solar Farm, The Farm Energy Company, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Rye House.
- Customer
- The Farm Energy Company
- Status
- Accepted to connect
- Capacity
- 10 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Rye House
- Bulk supply point
- Rye House Grid 33kV
- Point of connection
- Glaxo Primary 11kV
- Voltage
- 33 kV
- Date accepted
- 10 Mar 2022
- Target energisation
- 31 Oct 2034
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Aug 2026
- Licence area
- EPN
- Address
- Park Road, Ware
- Postcode
- SG12 0DP
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.