Wadlow Windfarm (East Connection - Bb2)
Wadlow Windfarm (East Connection - Bb2), Wadlow Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16.6 MW, grid supply point Burwell.
- Customer
- Wadlow Energy Limited
- Status
- Connected
- Capacity
- 16.6 MW
- Technology
- Onshore wind (Onshore wind turbines)
- Flexible connection
- No
- Grid supply point
- Burwell
- Bulk supply point
- Burwell Local Grid 33kV
- Voltage
- 33 kV
- Date connected
- 13 Sept 2012
- In a connection queue
- No
- Row last updated by the DNO
- 14 Dec 2020
- Licence area
- EPN
- Address
- Cambridge
- Postcode
- CB21 5BF
- Export MPAN
- 1030078016924
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.