Grid GuardianOpen the evidence in the app

Vigo Lane Solar Park

Vigo Lane Solar Park, Industria Resources, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Canterbury.

Customer
Industria Resources
Status
Accepted to connect
Capacity
40 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Canterbury
Point of connection
Canterbury North 132kV
Voltage
132 kV
Date accepted
9 Mar 2021
Target energisation
31 Jan 2029
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Vigo Lane PV, Sutton Baron Road, Sittingbourne
Postcode
ME9 8LH

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.