Unit 2 Bellingham Way

Unit 2 Bellingham Way, Tesco PLC, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.98 MW, grid supply point Northfleet East.

Customer
Tesco PLC
Status
Accepted to connect
Capacity
3.98 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Northfleet East
Bulk supply point
Burham
Point of connection
New Hythe Primary
Voltage
11 kV
Date accepted
5 Aug 2025
Target energisation
30 Mar 2026
In a connection queue
Yes
Row last updated by the DNO
12 Sept 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Aylesford
Postcode
ME20 6SP

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.