Unit 190, Kingsnorth Industrial Estate
Unit 190, Kingsnorth Industrial Estate, Ren Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.5 MW, grid supply point Kingsnorth.
- Customer
- Ren Energy
- Status
- Connected
- Capacity
- 2.5 MW
- Technology
- Gas (Gas turbine (OCGT))
- Flexible connection
- No
- Grid supply point
- Kingsnorth
- Point of connection
- Kingsnorth Grid 11kV
- Voltage
- 11 kV
- Date connected
- 1 May 2018
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Hoo
- Postcode
- ME3 9ND
- Export MPAN
- 1900091543804
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.