Tollgate Farm
Tollgate Farm, Brockwell Storage & Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16 MW, grid supply point Elstree.
- Customer
- Brockwell Storage & Solar Limited
- Status
- Accepted to connect, Connected
- Capacity
- 16 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Elstree
- Bulk supply point
- Hatfield Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 15 Jun 2020
- Target energisation
- 23 Nov 2027
- Date connected
- 3 May 2023
- In a connection queue
- Yes
- Row last updated by the DNO
- 12 Jul 2024
- Licence area
- EPN
- Address
- Tollgate Road, Colney Heath
- Postcode
- AL4 0NY
- Export MPAN
- 1097000000476
Register rows
| Row | Status | MW | Target |
|---|---|---|---|
| 1 | Accepted to connect | 16 | 23 Nov 2027 |
| 2 | Connected | 49.5 |
Rows at one site are not summed.
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.