Grid GuardianOpen the evidence in the app

Tilbury Road

Tilbury Road, Utility Connections, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Tilbury.

Customer
Utility Connections
Status
Connected
Capacity
2 MW
Maximum import capacity
5.5 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Tilbury
Bulk supply point
Basildon Grid 33kV
Point of connection
Langdon Primary 11kV
Voltage
11 kV
Date connected
19 Jan 2023
In a connection queue
No
Row last updated by the DNO
14 Jul 2023
Licence area
EPN
Address
Brentwood
Postcode
CM13 3LR

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source