Thornton Road
Thornton Road, Pathfinder Clean Energy (PACE) UKDEV Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 48.1 MW, grid supply point Sellindge.
- Customer
- Pathfinder Clean Energy (PACE) UKDEV Limited
- Status
- Accepted to connect
- Capacity
- 48.1 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Sellindge
- Point of connection
- Sellindge 132kV
- Voltage
- 132 kV
- Date accepted
- 24 Jul 2023
- Target energisation
- 31 Oct 2036
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Apr 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Dover
- Postcode
- CT15 4DT
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.