Grid GuardianOpen the evidence in the app

Thornton Road

Thornton Road, Pathfinder Clean Energy (PACE) UKDEV Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 48.1 MW, grid supply point Sellindge.

Customer
Pathfinder Clean Energy (PACE) UKDEV Limited
Status
Accepted to connect
Capacity
48.1 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Sellindge
Point of connection
Sellindge 132kV
Voltage
132 kV
Date accepted
24 Jul 2023
Target energisation
31 Oct 2036
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Dover
Postcode
CT15 4DT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source