The Old Grain Store
The Old Grain Store, Chaldean Estate Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.5 MW, grid supply point Rye House.
- Customer
- Chaldean Estate Limited
- Status
- Accepted to connect
- Capacity
- 2.5 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Rye House
- Bulk supply point
- Rye House Grid 33kV
- Point of connection
- Much Hadham Primary 11kV
- Voltage
- 132 kV
- Date accepted
- 24 Jul 2015
- Target energisation
- 31 Dec 2024
- In a connection queue
- Yes
- Row last updated by the DNO
- 13 Oct 2023
- Licence area
- EPN
- Address
- Bromley Lane, Much Hadham
- Postcode
- SG10 6HU
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.