Thames Refinery

Thames Refinery, Tate & Lyle, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.5 MW, grid supply point West Ham.

Customer
Tate & Lyle
Status
Connected
Capacity
5.5 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
West Ham
Bulk supply point
West Ham 66kV
Point of connection
Silvertown B 11kV
Voltage
6.6 kV
Date connected
1 Apr 1998
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
London Power Networks plc
Address
Factory Road, Royal Docks
Postcode
E16 2HL
Export MPAN
1200010261380

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.