Sugar Beet Factory

Sugar Beet Factory, British Sugar, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 58 MW, grid supply point Bramford.

Customer
British Sugar
Status
Connected
Capacity
58 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Bury Grid 33kV
Voltage
33 kV
Date connected
13 Aug 1999
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Bury St Edmunds
Postcode
IP32 7BZ
Export MPAN
1023485782546

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.