Stowbridge Farm, Stretham

Stowbridge Farm, Stretham, 21C Eco Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 21 MW, grid supply point Burwell.

Customer
21C Eco Energy
Status
Connected
Capacity
21 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Burwell
Bulk supply point
Burwell Local Grid 33kV
Voltage
33 kV
Date connected
26 Mar 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Burwell
Postcode
CB6 3LF
Export MPAN
1050000613856

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.