Stone Pit 1

Stone Pit 1, Land Logical Dartford, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 14.55 MW, grid supply point Northfleet East.

Customer
Land Logical Dartford
Status
Accepted to connect
Capacity
14.55 MW
Technology
Bioenergy, Storage (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Northfleet East
Bulk supply point
Northfleet East 33kV
Point of connection
Stonemarshes 11kV
Voltage
11 kV
Date accepted
13 Sept 2017
Target energisation
31 Oct 2025
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Cotton Lane, Dartford
Postcode
DA9 9BB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.