St.Marys Road
St.Marys Road, St Mary In The Marsh Renewable Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16 MW, grid supply point Sellindge.
- Customer
- St Mary In The Marsh Renewable Energy Limited
- Status
- Accepted to connect
- Capacity
- 16 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Sellindge
- Bulk supply point
- Ruckinge Grid
- Point of connection
- Ruckinge Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 23 Jan 2023
- Target energisation
- 31 Oct 2036
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Apr 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- St. Marys Road, Romney Marsh
- Postcode
- TN29 0BT
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.