Snodland Paper Mill

Snodland Paper Mill, Smurfit Kappa Townsend Hook, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point Kingsnorth.

Customer
Smurfit Kappa Townsend Hook
Status
Connected
Capacity
1.2 MW
Technology
Bioenergy (Other)
Flexible connection
No
Grid supply point
Kingsnorth
Bulk supply point
Medway Grid 33kV
Point of connection
Townsend Hook 6.6kV
Voltage
6.6 kV
Date connected
20 Apr 2015
In a connection queue
No
Row last updated by the DNO
15 Jan 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Mill Street, Snodland
Postcode
ME6 5AX
Export MPAN
1900091206194

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.