Smurfit Kappa Townsend Hook 9933
Smurfit Kappa Townsend Hook 9933, Smurfit Townsend Hook, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Kingsnorth.
- Customer
- Smurfit Townsend Hook
- Status
- Connected
- Capacity
- 40 MW
- Technology
- Gas (Steam-gas turbine (CCGT))
- Flexible connection
- No
- Grid supply point
- Kingsnorth
- Voltage
- 132 kV
- Date connected
- 7 Jan 1997
- In a connection queue
- No
- Row last updated by the DNO
- 14 Oct 2022
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Mill Street, Snodland
- Postcode
- ME6 5AX
- Export MPAN
- 1900060554947
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.