Slyfield Farm

Slyfield Farm, Cobham Road South Farm Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point West Weybridge.

Customer
Cobham Road South Farm Limited
Status
Accepted to connect
Capacity
49.9 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
West Weybridge
Bulk supply point
Leatherhead 132kV
Point of connection
Leatherhead Grid 33kV
Voltage
33 kV
Date accepted
26 Aug 2022
Target energisation
1 Jan 2025
In a connection queue
Yes
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Cobham Road, Cobham
Postcode
KT11 3QH

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.