Site Office Tilbury Docks

Site Office Tilbury Docks, Viridor, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5 MW, grid supply point Tilbury.

Customer
Viridor
Status
Accepted to connect
Capacity
5 MW
Technology
Bioenergy (Steam turbine (thermal power plant))
Flexible connection
No
Grid supply point
Tilbury
Voltage
132 kV
Date accepted
18 Aug 2022
Target energisation
31 Oct 2033
In a connection queue
Yes
Row last updated by the DNO
13 Oct 2023
Licence area
EPN
Address
Tilbury
Postcode
RM18 7NU

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.