Site not published: Moorhouse management Services Ltd BNP Paribas, Moorhouse, City Road GSP
Site not published: Moorhouse management Services Ltd BNP Paribas, Moorhouse, City Road GSP, Moorhouse management Services Ltd BNP Paribas, Moorhouse, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.2 MW, grid supply point City Road.
- Customer
- Moorhouse management Services Ltd BNP Paribas, Moorhouse
- Status
- Connected
- Capacity
- 3.2 MW
- Technology
- Fossil - Oil (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- City Road
- Point of connection
- Beech St B 11kV
- Voltage
- 11 kV
- Date connected
- 19 Sept 2015
- In a connection queue
- No
- Row last updated by the DNO
- 14 Dec 2021
- Licence area
- London Power Networks plc
- Address
- 120 London Wall, London Wall
- Postcode
- EC2Y 5ET
- Export MPAN
- 1200062039636
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.