Sewage Treatment Works - Phs Ii
Sewage Treatment Works - Phs Ii, Anglian Water, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.4 MW, grid supply point Bramford.
- Customer
- Anglian Water
- Status
- Connected
- Capacity
- 2.4 MW
- Maximum import capacity
- 1.2 MW
- Technology
- Gas (Gas turbine (OCGT))
- Flexible connection
- No
- Grid supply point
- Bramford
- Bulk supply point
- Cliff Quay Grid 33kV
- Point of connection
- Fore Hamlet Primary 11kV
- Voltage
- 11 kV
- Date connected
- 18 Mar 2011
- In a connection queue
- No
- Row last updated by the DNO
- 15 Jan 2021
- Licence area
- EPN
- Address
- Ipswich
- Postcode
- IP3 0ET
- Export MPAN
- 1030073208772
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.