Roydon Road

Roydon Road, AMP Clean Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.07 MW, grid supply point Rye House.

Customer
AMP Clean Energy
Status
Connected
Capacity
5.07 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Rye House
Bulk supply point
Harlow West Grid 33kV
Point of connection
Harlow West Grid 11kV
Voltage
11 kV
Date connected
22 Jun 2022
In a connection queue
No
Row last updated by the DNO
14 Nov 2022
Licence area
EPN
Address
Harlow
Postcode
CM19 5GH

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.