Pratts Bottom

Pratts Bottom, Boom Developments Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 45 MW, grid supply point Northfleet East.

Customer
Boom Developments Limited
Status
Accepted to connect
Capacity
45 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Northfleet East
Bulk supply point
Chelsfield Grid
Voltage
33 kV
Date accepted
16 Oct 2025
In a connection queue
Yes
Row last updated by the DNO
14 Nov 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Charmwood Farm, Orpington
Postcode
BR6 7SA

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.