Potters Bar Solar Farm
Potters Bar Solar Farm, UK Sustainable Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.5 MW, grid supply point Elstree.
- Customer
- UK Sustainable Energy Limited
- Status
- Connected
- Capacity
- 4.5 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Elstree
- Bulk supply point
- Hatfield Grid 33kV
- Point of connection
- West Potters Bar Primary 11kV
- Voltage
- 11 kV
- Date connected
- 31 Mar 2017
- In a connection queue
- No
- Row last updated by the DNO
- 14 Feb 2024
- Licence area
- EPN
- Address
- Cranborne Road, Potters Bar
- Postcode
- EN6 3JR
- Export MPAN
- 1050001299965
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.