Potten Street
Potten Street, The Farm Energy Company Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 84 MW, grid supply point Richborough.
- Customer
- The Farm Energy Company Limited
- Status
- Accepted to connect
- Capacity
- 84 MW
- Technology
- Onshore wind (Onshore Wind Turbines)
- Flexible connection
- No
- Grid supply point
- Richborough
- Bulk supply point
- Richborough Grid
- Voltage
- 132 kV
- Date accepted
- 17 Oct 2025
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Nov 2025
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Birchington
- Postcode
- CT7 0QW
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.