Potten Street

Potten Street, The Farm Energy Company Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 84 MW, grid supply point Richborough.

Customer
The Farm Energy Company Limited
Status
Accepted to connect
Capacity
84 MW
Technology
Onshore wind (Onshore Wind Turbines)
Flexible connection
No
Grid supply point
Richborough
Bulk supply point
Richborough Grid
Voltage
132 kV
Date accepted
17 Oct 2025
In a connection queue
Yes
Row last updated by the DNO
14 Nov 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Birchington
Postcode
CT7 0QW

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.