Grid GuardianOpen the evidence in the app

Plumtree Court

Plumtree Court, The London Project, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.6 MW, grid supply point City Road.

Customer
The London Project
Status
Connected
Capacity
1.6 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
City Road
Point of connection
City Rd C 11kV
Voltage
11 kV
Date connected
1 Nov 2019
In a connection queue
No
Row last updated by the DNO
15 Jan 2024
Licence area
London Power Networks plc
Address
City Of London
Postcode
EC4A 4HT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source