Playters Old Farm

Playters Old Farm, Eco Energy World, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Bramford.

Customer
Eco Energy World
Status
Connected
Capacity
10 MW
Maximum import capacity
0.1 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Ilketshall Grid 33kV
Voltage
33 kV
Date connected
21 Oct 2015
In a connection queue
No
Row last updated by the DNO
14 Nov 2023
Licence area
EPN
Address
Ellough, Norwich
Postcode
NR34 7TN
Export MPAN
1050000903174

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.