Ph 2 Cu-Mining Dagenham
Ph 2 Cu-Mining Dagenham, Thames Gateway Waste to Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 25 MW, grid supply point Barking 132kV (EPN).
- Customer
- Thames Gateway Waste to Energy Limited
- Status
- Accepted to connect
- Capacity
- 25 MW
- Technology
- Gas (Steam-gas turbine (CCGT))
- Flexible connection
- No
- Grid supply point
- Barking 132kV (EPN)
- Bulk supply point
- Crowlands Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 17 Apr 2015
- Target energisation
- 31 Dec 2024
- In a connection queue
- Yes
- Row last updated by the DNO
- 13 Sept 2024
- Licence area
- EPN
- Address
- Dagenham
- Postcode
- RM9 6LN
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.