Park Farm

Park Farm, Ecoenergy Renewable Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Sellindge.

Customer
Ecoenergy Renewable Energy Limited
Status
Accepted to connect
Capacity
49.9 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Sellindge
Bulk supply point
Sellindge Grid
Point of connection
Sellindge Local 33kV
Voltage
33 kV
Date accepted
18 Mar 2021
Target energisation
31 Oct 2031
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Pound Lane, Ashford
Postcode
TN25 6RG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source