Grid GuardianOpen the evidence in the app

Old Colliery

Old Colliery, Beba Energy UK Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1 MW, grid supply point Canterbury.

Customer
Beba Energy UK Limited
Status
Connected
Capacity
1 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Canterbury
Bulk supply point
Canterbury South 33kV
Point of connection
Wingham 11kV
Voltage
11 kV
Date connected
12 Feb 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Staple Road, Canterbury
Postcode
CT3 1LS
Export MPAN
1900091341887

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source