Norwich Road

Norwich Road, RNA Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Bramford.

Customer
RNA Energy Limited
Status
Connected
Capacity
40 MW
Maximum import capacity
40 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Bramford
Voltage
132 kV
Date connected
29 Jan 2024
In a connection queue
No
Row last updated by the DNO
14 Mar 2024
Licence area
EPN
Address
Halesworth
Postcode
IP19 8QJ
Export MPAN
1050002549096
Import MPAN
1050002549087

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.