Grid GuardianOpen the evidence in the app

Mollison Avenue Enfield

Mollison Avenue Enfield, Low Carbon Alliance, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20 MW, grid supply point Brimsdown (EPN).

Customer
Low Carbon Alliance
Status
Connected
Capacity
20 MW
Maximum import capacity
0.2 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Brimsdown (EPN)
Bulk supply point
Brimsdown North Grid 33kV
Voltage
33 kV
Date connected
13 Nov 2018
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Enfield
Postcode
EN3 7NJ
Export MPAN
1050001620720

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source