Mogden Stw, Thames Water Utilities Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point Laleham.

Customer
Thames Water Utilities Limited
Status
Connected
Capacity
18 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Laleham
Bulk supply point
Twickenham Grid 33kV
Voltage
11 kV
Date connected
7 Dec 2012
In a connection queue
No
Row last updated by the DNO
12 Aug 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Mogden STW, Isleworth
Postcode
TW7 7LR
Export MPAN
1900090876979

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.