Milton Landfill Gas Generation B

Milton Landfill Gas Generation B, Infinis Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.12 MW, grid supply point Burwell.

Customer
Infinis Limited
Status
Connected
Capacity
2.12 MW
Technology
Bioenergy (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Burwell
Bulk supply point
Arbury Grid 33kV
Point of connection
Arbury Grid 11kV
Voltage
11 kV
Date connected
28 Nov 2006
In a connection queue
No
Row last updated by the DNO
14 Sept 2021
Licence area
EPN
Address
Butt Lane, Milton
Postcode
CB24 6DQ
Export MPAN
1023479976426

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.