Milton Court Farm

Milton Court Farm, Grid Battery Storage Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point West Weybridge.

Customer
Grid Battery Storage Limited
Status
Connected
Capacity
6 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
West Weybridge
Bulk supply point
Leatherhead Grid 33kV
Point of connection
Dorking Town 11kV
Voltage
11 kV
Date connected
14 Aug 2018
In a connection queue
No
Row last updated by the DNO
14 Dec 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Westcott Road, Dorking
Postcode
RH4 3LY
Export MPAN
1900091646750

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.