Mill Lane

Mill Lane, Infinis Energy Services Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.98 MW, grid supply point Rye House.

Customer
Infinis Energy Services Limited
Status
Connected
Capacity
2.98 MW
Maximum import capacity
0 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Rye House
Bulk supply point
Epping Grid 33kV
Point of connection
Ongar Primary 11kV
Voltage
11 kV
Date connected
13 Jul 2018
In a connection queue
No
Row last updated by the DNO
17 May 2021
Licence area
EPN
Address
Ongar
Postcode
CM5 9RG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source