Lower Dunton Road

Lower Dunton Road, CedarTech Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 28 MW, grid supply point Tilbury.

Customer
CedarTech Limited
Status
Connected
Capacity
28 MW
Maximum import capacity
28 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Tilbury
Bulk supply point
Basildon Grid 33kV
Voltage
33 kV
Target energisation
30 Oct 2024
Date connected
15 May 2026
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2026
Licence area
EPN
Address
Upminster
Postcode
RM14 3TD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.