Laurels Farm

Laurels Farm, Laurels Farm Renewable Power Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Bramford.

Customer
Laurels Farm Renewable Power Limited
Status
Accepted to connect
Capacity
2 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Ilketshall Grid 33kV
Point of connection
Barsham Primary 11kV
Voltage
11 kV
Date accepted
15 Dec 2020
Target energisation
28 Sept 2025
In a connection queue
Yes
Row last updated by the DNO
13 Sept 2024
Licence area
EPN
Address
Beccles
Postcode
NR34 8HD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source