Langham / Boxted Airfield

Langham / Boxted Airfield, Push Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16.2 MW, grid supply point Bramford.

Customer
Push Energy
Status
Connected
Capacity
16.2 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Lawford Grid 33kV
Voltage
33 kV
Date connected
4 Nov 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Langham / Boxted Airfield, Colchester
Postcode
CO4 5HY
Export MPAN
1050000774289

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.