Land West Of Thorne Hill
Land West Of Thorne Hill, QC Magnus Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 35.71 MW, grid supply point Richborough.
- Customer
- QC Magnus Limited
- Status
- Accepted to connect
- Capacity
- 35.71 MW
- Technology
- Storage (Storage - Electrochemical (Batteries))
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Richborough
- Voltage
- 33 kV
- Date accepted
- 31 May 2025
- In a connection queue
- Yes
- Row last updated by the DNO
- 13 Jun 2025
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Ramsgate
- Postcode
- CT12 5DS
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.