Grid GuardianOpen the evidence in the app

Land At Shardelowes Farm

Land At Shardelowes Farm, BSR Applications Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30 MW, grid supply point Burwell.

Customer
BSR Applications Limited
Status
Accepted to connect
Capacity
30 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Burwell
Bulk supply point
Fulbourn Grid 132/33kV
Voltage
33 kV
Date accepted
18 Mar 2025
In a connection queue
Yes
Row last updated by the DNO
15 May 2025
Licence area
EPN
Address
Balsham Road, Cambridge
Postcode
CB21 5DA

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source