Land At Harp Farm

Land At Harp Farm, BSR Applications Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Kingsnorth.

Customer
BSR Applications Limited
Status
Accepted to connect
Capacity
15 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Kingsnorth
Bulk supply point
Chatham Grid
Point of connection
Chatham Grid 33kV
Voltage
33 kV
Date accepted
30 Jan 2023
Target energisation
30 Apr 2025
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Land At Harp Farm, Harp Farm Road, Maidstone
Postcode
ME14 3ED

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.