Grid GuardianOpen the evidence in the app

Land At Ernest Nunn Road

Land At Ernest Nunn Road, Plutus Powergen, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Bramford.

Customer
Plutus Powergen
Status
Connected
Capacity
40 MW
Maximum import capacity
0.52 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Bramford
Voltage
132 kV
Date connected
19 Nov 2017
In a connection queue
No
Row last updated by the DNO
14 Nov 2023
Licence area
EPN
Address
Stowmarket
Postcode
IP14 2ED
Export MPAN
1050001466304

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source