Land 1A Priory Stables
Land 1A Priory Stables, Conrad Energy (Developments) II Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point West Weybridge.
- Customer
- Conrad Energy (Developments) II Limited
- Status
- Accepted to connect
- Capacity
- 18 MW
- Technology
- Gas (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- West Weybridge
- Bulk supply point
- W. Weybridge 132/33
- Point of connection
- Chertsey 11kV
- Voltage
- 11 kV
- Date accepted
- 3 Oct 2022
- Target energisation
- 10 Jan 2026
- In a connection queue
- Yes
- Row last updated by the DNO
- 12 Jul 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Chertsey Road, Shepperton
- Postcode
- TW17 9NU
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.