Land 1A Priory Stables

Land 1A Priory Stables, Conrad Energy (Developments) II Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point West Weybridge.

Customer
Conrad Energy (Developments) II Limited
Status
Accepted to connect
Capacity
18 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
West Weybridge
Bulk supply point
W. Weybridge 132/33
Point of connection
Chertsey 11kV
Voltage
11 kV
Date accepted
3 Oct 2022
Target energisation
10 Jan 2026
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Chertsey Road, Shepperton
Postcode
TW17 9NU

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.