Grid GuardianOpen the evidence in the app

Lackford Estate

Lackford Estate, Inazin Power Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 25 MW, grid supply point Bramford.

Customer
Inazin Power Limited
Status
Connected
Capacity
25 MW
Maximum import capacity
0.05 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Bury Grid 33kV
Voltage
33 kV
Date connected
23 Mar 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Lackford, Bury St Edmunds
Postcode
IP28 6HS
Export MPAN
1050000578699

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source