Kingsnorth Power Station
Kingsnorth Power Station, Medway Energy Recovery Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Kingsnorth.
- Customer
- Medway Energy Recovery Limited
- Status
- Accepted to connect
- Capacity
- 49.9 MW
- Technology
- Energy from waste (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Kingsnorth
- Point of connection
- Kingsnorth Grid 132kV
- Voltage
- 132 kV
- Date accepted
- 18 Jun 2021
- Target energisation
- 31 Dec 2024
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Jun 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Kingsnorth Power Station, Rochester
- Postcode
- ME3 9NQ
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.