Kessingland Wind Farm

Kessingland Wind Farm, Triodos Renewables, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.1 MW, grid supply point Bramford.

Customer
Triodos Renewables
Status
Connected
Capacity
4.1 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Ilketshall Grid 33kV
Point of connection
Henstead Primary 11kV
Voltage
33 kV
Date connected
7 Jun 2011
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Lowestoft
Postcode
NR33 7TF
Export MPAN
1030074559563

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.