Grid GuardianOpen the evidence in the app

Kentish Flats Phase 2

Kentish Flats Phase 2, Xero Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.5 MW, grid supply point Canterbury.

Customer
Xero Energy Limited
Status
Connected
Capacity
49.5 MW
Technology
Offshore wind (Offshore wind turbines)
Flexible connection
No
Grid supply point
Canterbury
Bulk supply point
Herne Bay Grid 33kV
Voltage
33 kV
Date connected
21 Aug 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Herne Bay
Postcode
CT6 7NU
Export MPAN
1900091199528

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.