Grid GuardianOpen the evidence in the app

John Woods Nurseries ICP Pettistree

John Woods Nurseries ICP Pettistree, Mosscliff Environmental Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.07 MW, grid supply point Bramford.

Customer
Mosscliff Environmental Limited
Status
Connected
Capacity
1.07 MW
Maximum import capacity
0.01 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Wickham Market Grid 33kV
Point of connection
Hacheston Primary 11kV
Voltage
33 kV
Date connected
1 Jul 2016
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Woodbridge
Postcode
IP13 0NJ
Export MPAN
1050000834291

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source